Pass Guaranteed Quiz 2025 Realistic Verified Free AACE-PSP Exam Dumps [Q76-Q94]

Share

Pass Guaranteed Quiz 2025 Realistic Verified Free AACE-PSP Exam Dumps

Free AACE Certification AACE-PSP Ultimate Study Guide (Updated 165 Questions)


AACE-PSP certification program is designed to recognize and validate professionals' expertise in project planning and scheduling. Planning & Scheduling Professional (PSP) Exam certification program covers the fundamental principles of planning and scheduling, including project planning, scheduling, monitoring, and control. The AACE-PSP certification program is globally recognized and is highly valued by employers worldwide.

 

NEW QUESTION # 76
What changes to logic would eliminate Activity B from the critical path?

  • A. Reduce the lag value of the relationship from Activity A to Activity B from 5 to 0
  • B. Replace the relationship from Activity B to Activity C with SSO
  • C. Add a SS 15 relationship from Activity A to Activity B and replace the relationship from Activity A to Activity B with FFO
  • D. Replace the relationship from Activity A to Activity B with FFO and add an FSO relationship from Activity A to Activity C

Answer: D


NEW QUESTION # 77
All the following describe the critical path of a schedule EXCEPT:

  • A. Changed by redefining the network logic or changing activity durations or both.
  • B. Frequently defined as the shortest path through the schedule.
  • C. The series of activities having the least amount of total float.
  • D. Determined by network logic and is the chain of activities that controls the overall project completion time.

Answer: B


NEW QUESTION # 78
What is the result of a forward pass calculation?

  • A. Value of free float for individual activities
  • B. Value of total float for individual activities
  • C. Early start and early finish date for individual activities
  • D. Critical path

Answer: C


NEW QUESTION # 79
Using the "normal" schedule, what is the early finish date of activity 10002 and its total float?

  • A. 12-18-03 and 25 days of float
  • B. 12-17-03 and 4 days of float
  • C. 12-27-03 and 24 days of float
  • D. 12-18-03 and 4 days of float

Answer: B


NEW QUESTION # 80
As a change to the network for the current update, activity 6002 is required to begin ten days after the beginning of activity 6001. Which is the simplest logic organization?

  • A. A start-to-finish relationship with both activities 6001 and 6002 having a ten-day lag
  • B. A start-to-start relationship with a ten-day lag assigned to activity 6001; activity 6002 will be dependent on activity 6001
  • C. A finish-to-start relationship with a ten-day lag assigned to activity 6002; activity 6001 will be dependent on activity 6002
  • D. A start-to-start to relationship for both activities 6001 and 6002 with a ten-day lag assigned to activity 6002.

Answer: B


NEW QUESTION # 81
Who will receive the most benefit from a master schedule of the Spring Highway project?

  • A. SDOT
  • B. BILCO
  • C. ALPHA
  • D. GOUGE. Inc

Answer: A


NEW QUESTION # 82
If Activity E's duration changes to 4 months, what is the overall duration of the project.

  • A. 22 months.
  • B. 20 months.
  • C. 21 months.
  • D. 19 months.

Answer: B


NEW QUESTION # 83
Why does activity 1001 have two successor activities?

  • A. Because there are two defined logic paths for the work
  • B. Because the late finish of 1001 and the late start of 7001 require two successors
  • C. Because the problem could not effectively work with only one successor
  • D. Because the duration of activities 2001, 2002 and 200.f require two successors

Answer: A


NEW QUESTION # 84
When resource leveling craft labor for a critical path schedule, the scheduler

  • A. Can depend on the results of the resource leveling operation to reflect a useful realignment of all schedule activities without 'further analysis.
  • B. Must consider breaks in continuity of work for subcontractors, thereby possibly incurring additional subcontractor mobilization and demobilization costs.
  • C. Need only consider the non-union crafts persons.
  • D. Need not consider its effects, as it is a theoretical concept with limited application to construction projects.

Answer: A


NEW QUESTION # 85
What is the free float for Activity F?

  • A. 2month.
  • B. 3 months.
  • C. 1months.
  • D. 0months.

Answer: D


NEW QUESTION # 86
Theoretically construct a summary activity for activities 6001 through 6003. Identify the governing predecessor and successor activities for the hammock:

  • A. Predecessor is activity 5001, successor is activity 8002
  • B. Predecessor is activity 4001, successor is activity 8001
  • C. Predecessor is activity 9001, successor is activity 9002
  • D. Predecessor is activity 5001, successor is activity 8001

Answer: D


NEW QUESTION # 87
The sum of all budgets for work scheduled to be accomplished within a given time period is the ____________.

  • A. Estimate at completion (EAC)
  • B. Budgeted cost of work scheduled (BCWS)
  • C. Budget at completion (BAC)
  • D. Budgeted cost of work performed (BCWP)

Answer: C


NEW QUESTION # 88
What is the relationship depicted between Activity G and Activity H?

  • A. You cannot tell with the supplied information.
  • B. Finish-to-start.
  • C. Finish-to-finish.
  • D. Start-to-start.

Answer: D


NEW QUESTION # 89
Which of the following will always describe the critical path? The path with

  • A. The shortest duration and negative float.
  • B. Zero float.
  • C. The longest duration through the network.
  • D. Negative float.

Answer: B


NEW QUESTION # 90
Which of the following documents is most likely to be of the LEAST value to a planner/scheduler when planning a contractor's baseline critical path schedule for the construction of a large high-clearance bridge located very near an airport? The contractor has been awarded the contract.

  • A. The government's report on future high-clearance bridge projects
  • B. The project plans and specifications
  • C. The project geotechnical report
  • D. The regulations published by the government aviation agency

Answer: D


NEW QUESTION # 91
If the administrative constraints for developing the precedence diagram, as provided in the contract documents, indicate that no individual construction activities shall have a longer duration of two months, how many activities in the "normal" schedule would be affected?

  • A. Cannot be determined.
  • B. 12.
  • C. 14.
  • D. 13.

Answer: B


NEW QUESTION # 92
Budgeted cost of work scheduled is _______________________.

  • A. The sum of all budgets for work scheduled to be accomplished within a given time period
  • B. The total authorized budget for accomplishing the project scope
  • C. The value of the completed work expressed in terms of the budget assigned to that work
  • D. The expected total cost of an activity, group of activities or the project

Answer: D


NEW QUESTION # 93
For activity 11001. why would the crashed direct cost be greater than the direct cost of the normal schedule?

  • A. Generally, more equipment is used for a crashed project; therefore, it costs more to demobilize
  • B. Management bonuses for early completion were included in this activity
  • C. Some costs resulting from the crashed efforts were forgotten in previous activities
  • D. Additional extended overhead is also being shown in this activity

Answer: A


NEW QUESTION # 94
......

Get to the Top with AACE-PSP Practice Exam Questions: https://www.validdumps.top/AACE-PSP-exam-torrent.html

Use Real AACE-PSP Dumps Free Sample Questions and Practice Test Engine: https://drive.google.com/open?id=1NWLky6bRE2DHXl5EP15oEMN1v_8gbuA3