NEW QUESTION 31
What is the purpose of collective orders?
- A. To post any component withdrawal as single backflush with order confiramtion
- B. To post production costs on a cost collector instead of the production order
- C. To combine order management of co-products any by-products with the main product.
- D. To manage production orders for an entire finished product on multiple levels
Answer: D
NEW QUESTION 32
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
- A. Consumption-based planning
- B. Material requirements planning
- C. Manual planning without check
- D. Forecast planning
Answer: A
NEW QUESTION 33
Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?
- A. Resource network
- B. Work center hierarchy
- C. Operation network
- D. Setup matrix
Answer: B
NEW QUESTION 34
The MRP run detected a shortage of a materila that you sorce from an external supplier in full pallets. How can you make sure you will only recive full pallets?
- A. Use the fixed lot procedure.
- B. Use the reorder point
- C. Use the MRP type for vendor managed inventory.
- D. Use the minimum order quantity
Answer: A
NEW QUESTION 35
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
- A. Fill up based on the lot size procedure
- B. Fill up to the safety stoc level
- C. Fill up to the reorder stock level
- D. Fill up to the maximum stock level
Answer: A
NEW QUESTION 36
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
- A. When alternate resources are used within one operation
- B. When multiple production versions are maintained for one product
- C. When multiple planned orders exist on one resource
- D. When multiple operations are maintained for one product
Answer: A
NEW QUESTION 37
When do you use variant bills of materials (BOMs)?
- A. When a material has a configurable BOM
- B. When multiple materials have multiple BOMs
- C. When a material has multiple BOMs
- D. When multiple materials also have similar BOMs
Answer: B
NEW QUESTION 38
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A. Planning with final assembly (40)
- B. Planning at assembly level (70)
- C. Planning without final assembly (50)
- D. Make-to-order production (20)
Answer: C
NEW QUESTION 39
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?
- A. SAP SuccessFactors
- B. SAP Fieldglass
- C. SAP Concur
- D. SAP Hybris
- E. SAP Ariba
Answer: B,C,E
NEW QUESTION 40
Which materials have a negative quantity in a bill of materials or in a recipe?
- A. Bulk materials
- B. By-products
- C. Co-products
- D. Continuous flow materials
- E. Waste products
Answer: B,C,D
NEW QUESTION 41
Your production planners must execute planning only for specific resources. How can you achive this in advanced Planning(PP/DS)
- A. Use a planning group.
- B. Use a propagation range.
- C. Use a resource group.
- D. Use heuristic.
Answer: D
NEW QUESTION 42
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?
- A. MRP type
- B. MRP group
- C. MRP planning file
- D. MRP controller
Answer: D
NEW QUESTION 43
Your quality department detect a deviation in a raw material batch. Unfortunately, this batch has already been used in producion. How can you indentify all affected finish goods stocks?
- A. Use the material staging report.
- B. Use the batch information cockpit.
- C. Use batch determination.
- D. Use the material where-used report.
Answer: B
NEW QUESTION 44
Which item statuses can you select inside a material BOM?
- A. Service
- B. Sales
- C. Engineering
- D. Quality management
Answer: B,C
NEW QUESTION 45
How can you carry out cost object controlling for production orders?
- A. Order-related
- B. Milestone-related
- C. Cost-related
- D. Product-related
Answer: A,D
NEW QUESTION 46
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider?
- A. The display template for material numbers applies to all clients.
- B. In Customizing you can decide by material type whether to use the long material number.
- C. The maximum mater all number length is 40 for external numbers and 18 for internal numbers
- D. The number of leading zeros for internal numbers is client-specific.
Answer: A,C
NEW QUESTION 47
In your plant, MRP is activated.
Which option do you have to exclude a materila from the MRP run?
- A. Use a specific material status
- B. Use a specific MRP type
- C. Use specific MRP controller
- D. Use a specific material group
Answer: C,D
NEW QUESTION 48
Which chart types does the tabular planning table provide in SAP S/4HANA
- A. Order (pool) chart
- B. Capacity requirements chart
- C. Order (dispatched) chart
- D. Work center capacities chart
Answer: B,D
NEW QUESTION 49
Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the advanced planning flag?
- A. Material
- B. Production version
- C. Work center
- D. Plant
Answer: A,C
NEW QUESTION 50
Your proyect team decides to use a make-to-order planning strategy for strategic in discrete manufacturing.
What is the impact of this decision?
- A. Storage location MRP areas are required.
- B. A sales-order-specific planning run is required.
- C. Production orders specific stock is created
- D. Net requirement calcualtion is sales-order specific.
Answer: B,C,D
NEW QUESTION 51
How can you set up the supply source for the Kanban process in SAP S/4HANA?
- A. Using stock transfer reservations for stock transfer
- B. Using quotations for internal and external procurement
- C. Using purchasing costs for automated source prioritization
- D. Using run schedule quantities for in-house production
- E. Using purchase orders for external procurement
Answer: A,D,E
NEW QUESTION 52
What type of time element can be reduced by strategy settings while dispatching?
- A. Transportation time
- B. Wait time
- C. Setup time
- D. Queue time
Answer: B,D
NEW QUESTION 53
You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in the past. How can you achive this?
- A. Specify a positive planning horizon in the strategy profile.
- B. Specify a positive offset time in the strategy profile.
- C. Specify a negative offset time in the strategy profile.
- D. Specify a negative lanning horizon in the strategy profile.
Answer: C
NEW QUESTION 54
What is the difference between co-products and by-products?
- A. Only co-products can be manufactured in isolation from the main product.
- B. Only co-products appear in the process or production order settlement rule.
- C. Only co-products are identified by a special item category in the bill of material (BOM).
- D. Only by-products have a zero inventory valuation.
Answer: B
NEW QUESTION 55
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. WBS item
- B. Non-stock item
- C. Work item
- D. Variable-size item
Answer: B,D