NEW QUESTION # 41
Which of the following Water Efficiency credits differ between LEED Building Design and Construction:
New Construction and LEED Building Design and Construction: Healthcare?

  • A. LEED Building Design and Construction: Healthcare has no Water Efficiency Credit, Cooling Tower Water Use
  • B. LEED Building Design and Construction: Healthcare has additional appliance and process water requirements in Water Efficiency Prerequisite, Indoor Water Use Reduction
  • C. LEED Building Design and Construction: New Construction has no Water Efficiency Credit, Cooling Tower Water Use
  • D. LEED Building Design and Construction: New Construction has additional appliance and process water requirements in Water Efficiency Prerequisite, Indoor Water Use Reduction

Answer: B

Explanation:
Explanation
LEED Building Design and Construction: Healthcare has additional appliance and process water requirements in Water Efficiency Prerequisite, Indoor Water Use Reduction LEED Building Design and Construction: New Construction and LEED Building Design and Construction:
Healthcare have the same Water Efficiency credits, except for the Cooling Tower Water Use credit, which is only applicable to the former. However, the Indoor Water Use Reduction prerequisite differs between the two rating systems, as the Healthcare version requires additional calculations for appliance and process water use, such as medical equipment, laundry, and kitchen equipment.
References:
Reference Guide for Building Design and Construction v4 - Pages 256-3171 LEED v4: Building Design + Construction Guide - U.S. Green Building Council2


NEW QUESTION # 42
Which of the following strategies would be considered an acceptable minor improvement within the wetland buffer for Location and Transportation Credit, Sensitive Land Protection?

  • A. Change the grade to install a security fence
  • B. Remove trees that are less than 6 inches (15.24 cm) diameter at breast height
  • C. Build a two-story fitness facility
  • D. Provide a vehicular access drive that is less than 16 ft. (5 m) in width

Answer: D

Explanation:
Explanation
Providing a vehicular access drive that is less than 16 ft. (5 m) in width is considered an acceptable minor improvement within the wetland buffer for Location and Transportation Credit, Sensitive Land Protection.
This credit requires avoiding development on land that meets one or more of the following criteria: prime farmland, floodplains, threatened or endangered species habitat, water bodies, wetlands, or land within 100 feet (30 meters) of these water bodies or wetlands1. However, the credit allows minor improvements within the wetland buffer if they are necessary for the project and have minimal environmental impact2. Examples of minor improvements include trails, boardwalks, stormwater outfalls, and utility crossings2. References:
Credit: Sensitive land protection | U.S. Green Building Council
NC-v4.1 LTc2: Sensitive land protection | LEEDuser


NEW QUESTION # 43
LEED project boundaries that include multiple similar buildings which are all eligible for certification can be registered as which of the following?

  • A. Neighborhood project
  • B. Group project
  • C. Batch project
  • D. Master Site project

Answer: B

Explanation:
Explanation
LEED project boundaries that include multiple similar buildings which are all eligible for certification can be registered as a group project. A group project allows multiple buildings (or interior spaces within multiple buildings) on a shared site to be certified as a single LEED project. These projects must meet the criteria outlined in the LEED Campus Guidance for Projects on a Shared Site, such as having the same construction contract, ownership, management, space type, rating system, and compliance paths. A group project will receive one certification and rating for the entire group.References: Group Projects (previously Multiple Building Projects), CAGBC News, September 1, 2020.


NEW QUESTION # 44
According to the Integrative Process Credit, the discovery phase of energy-related systems should identify

  • A. functional performance tests
  • B. ventilation rates
  • C. thermal comfort ranges
  • D. transportation options

Answer: B

Explanation:
Explanation
According to the LEED v4 Reference Guide for Building Design and Construction, the discovery phase of energy-related systems should identify ventilation rates, along withother factors such as building orientation, envelope attributes, lighting levels, plug and process loads, and programmatic and operational parameters1.These factors should be used to create a preliminary "simple box" energy model to evaluate the energy performance of the building and explore potential strategies to reduce energy use1. The other options are not relevant for the discovery phase of energy-related systems.Functional performance tests are part of the implementation phase1.Thermal comfort ranges are related to indoor environmental quality2.Transportation options are related to sustainable sites3.References: IP Credit Integrative Process, LEED v4 Reference Guide for Building Design and Construction4123


NEW QUESTION # 45
What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?

  • A. Retail projects must conduct a waste stream audit twice a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided
  • B. Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. Identify the top-five recyclable waste streams while stating the top-four waste streams where both collection and storage space will be provided
  • C. Retail projects must conduct a waste stream audit once a month for the project in an existing or rented location or make projections based on data gathered from a previous cycle. Identify the top-three recyclable waste streams while stating the top-two waste streams where both collection and storage space will be provided
  • D. Retail projects must conduct a waste stream audit for the once a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

Answer: B

Explanation:
Explanation
Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. Identify the top-five recyclable waste streams while stating the top-four waste streams where both collection and storage space will be provided.
This is the requirement for Retail projects under the Materials and Resources Prerequisite, Storage and Collection of Recyclables, according to the LEED v4 BD+C Reference Guide1. The purpose of this prerequisite is to facilitate the reduction of waste generated by building occupants that is hauled to and disposed of in landfills1. The prerequisite applies to all LEED BD+C projects, but Retail projects have a different approach than other project types because of their unique waste streams and operational characteristics1. Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. The audit or projection must identify the top-five recyclable waste streams by weight or volume using consistent metrics throughout1. The waste stream study period must be a minimum of 24 hours1. Retail projects must also provide dedicated areas that serve the entire building and are accessible to waste haulers and building occupants for the collection and storage of materials for recycling for at least four of the top-five recyclable waste streams identified by the audit or projection1. References:
Prerequisite: Storage and collection of recyclables | U.S. Green Building Council


NEW QUESTION # 46
A new commercial building is being designed to use small capacity air handling units. To meet the requirements of the Carbon Dioxide Monitoring strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Environmental Quality Strategies, where would CO2 monitors need to be located?

  • A. In each occupied space
  • B. In each occupied space over 500 ft2 (46 m2)
  • C. In each densely occupied space
  • D. In each occupied space and outdoors

Answer: C

Explanation:
Explanation
According to the LEED v4 Reference Guide for Building Design and Construction, the Carbon Dioxide Monitoring strategy requires CO2 monitors to be located in each densely occupied space, which is defined as a space with a design occupant density of 25 people or more per 1,000 square feet (93 square meters). This strategy is intended to provide feedback on ventilation system performance and indoor air quality12 References: 1: LEED v4 Reference Guide for Building Design and Construction, Indoor Environmental Quality Credit: Enhanced Indoor Air Quality Strategies, Option 2: Additional Enhanced IAQ Strategies, Strategy 3: Carbon Dioxide Monitoring, page 704. 2: LEED v4 Reference Guide for Building Design and Construction, Glossary, page 1019.


NEW QUESTION # 47
Which of the following is required when documenting a LEED Pilot credit?

  • A. Innovation narrative
  • B. Pilot Credit registration
  • C. LEED AP approval
  • D. Compliance letter

Answer: B

Explanation:
Explanation
Pilot Credit registration is required when documenting a LEED Pilot credit. This is to ensure that the project team has access to the latest pilot credit language and requirements, and that USGBC can track the usage and feedback of the pilot credits. The other options are not required for documenting a pilot credit, although they may be helpful or applicable for other credits.References: LEED Pilot Credit Library, Getting Started, page 1.


NEW QUESTION # 48
When using the Integrative Process, what is the best way for the LEED AP to assess the impact of indoor and outdoor water consumption in a Building Design and Construction project?

  • A. At the completion of schematic design, count the fixtures and apply the maximum flow rate
  • B. Perform a preliminary water budget analysis before the completion of schematic design
  • C. Estimate consumption by using 20 gal. per day (76 I per day) for each Full Time Equivalent (FTE) scheduled to occupy the building
  • D. Install permanent metering on both the water sources and the waste water leaving the site

Answer: B

Explanation:
Explanation
When using the Integrative Process, the best way for the LEED AP to assess the impact of indoor and outdoor water consumption in a Building Design and Construction project is to perform a preliminary water budget analysis before the completion of schematic design. This analysis should include the following steps1:
Identify the project's water sources and uses, such as potable water, reclaimed water, rainwater, graywater, blackwater, irrigation, cooling towers, etc.
Estimate the baseline water consumption for each use based on the applicable codes, standards, and benchmarks.
Identify potential water conservation strategies that can reduce the demand or increase the supply of water, such as low-flow fixtures, native landscaping, rainwater harvesting, graywater reuse, etc.
Evaluate the feasibility, cost-effectiveness, and environmental benefits of each strategy using a life-cycle approach.
Select the most appropriate strategies and document how they inform the design decisions and meet the project goals.
Compare the projected water consumption with the baseline and calculate the percentage reduction.
Performing a preliminary water budget analysis before the completion of schematic design allows the LEED AP to identify opportunities for water efficiency and innovation early in the design process. It also helps to optimize the integration of water systems with other building and site systems, such as energy, materials, indoor environmental quality, etc. Moreover, it supports the achievement of other LEED credits related to water efficiency, such as WE Prerequisite 1: Outdoor Water Use Reduction, WE Prerequisite 2: Indoor Water Use Reduction, WE Credit 1: Outdoor Water Use Reduction, WE Credit 2: Indoor Water Use Reduction, WE Credit 3: Cooling Tower Water Use2.
References:
Understanding Integrative Design in LEED v41
LEED v4 for Building Design and Construction2


NEW QUESTION # 49
Which of the following are the major factors determining the total irrigation requirement for a particular landscaping design?

  • A. Relative humidity, site exposure, plant species and planting density
  • B. Plant species, rainfall, evapotranspiration rate, site exposure and irrigation efficiency
  • C. Plant species, rainwater tank size, evapotranspiration rate, site exposure and irrigation efficiency
  • D. Planting density, soil conditions, irrigation efficiency and rainfall

Answer: B

Explanation:
Explanation
These factors are the major determinants of the total irrigation requirement for a landscaping design, because they affect the water demand and supply of the plants1. Plant species have different water needs and tolerances, rainfall provides natural water input, evapotranspiration rate measures the water loss from the soil and plant surfaces, site exposure influences the solar radiation and wind effects, and irrigation efficiency reflects the amount of water delivered to the plants compared to the amount of water applied2.
References: = [LEED v4: Building Design + Construction Guide], Landscape Water Requirement Calculators, Landscape Irrigation Design Manual.


NEW QUESTION # 50
The Solar Reflectance Index (SRI) includes the measure of a material's

  • A. ability to absorb solar radiation
  • B. ability to reflect thermal radiation
  • C. ability to reflect solar radiation
  • D. color (shade of gray)

Answer: C

Explanation:
Explanation
The Solar Reflectance Index (SRI) is a measure of the roof's ability to reject solar heat, as shown by a small temperature rise. It is defined so that a standard black (reflectance 0.05, emittance 0.90) is 0 and a standard white (reflectance 0.80, emittance 0.90) is 100. SRI is calculated using the roof surface's Solar Reflectance (SR) and Thermal Emittance (TE). SR is the fraction of solar energy that is reflected by the roof, and TE is the relative ability of the roof surface to radiate heat. Therefore, SRI includes the measure of a material's ability to reflect solar radiation, but not its ability to absorb or emit thermal radiation.
References:
* What is the Solar Reflectance Index? - Cool Roof Rating Council
* Definitions and Terms | HEATISLAND


NEW QUESTION # 51
What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

  • A. Two
  • B. One
  • C. Six
  • D. Four

Answer: D

Explanation:
Explanation
According to the LEED Reference Guide for Building Design and Construction1, the Integrative Process Prerequisite, Integrative Project Planning and Design, requires the project to assemble an integrated project team that includes at least four key project team members, in addition to the owner or owner's representative.
The key project team members are those who have the authority and responsibility to make design decisions and implement them during construction. The integrated project team should include professionals from different disciplines, such as architecture, engineering, landscape, interior design, construction, commissioning, operations, and maintenance. The integrated project team should collaborate throughout the project phases, from discovery to occupancy, to achieve the project goals and optimize the building performance.
References:
* LEED Reference Guide for Building Design and Construction v4
* Integrated Product Team (IPT) - AcqNotes
* The Power of an Integrated Project Team Process - Little


NEW QUESTION # 52
When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following information is required to be present in the Owner's Project Requirements (OPR)?

  • A. Interior finishes related to the project
  • B. All project team members and applicable roles
  • C. All applicable codes and standards
  • D. Energy efficiency goals and training requirements

Answer: D

Explanation:
Explanation
Energy efficiency goals and training requirements are required to be present in the Owner's Project Requirements (OPR) when applying the Integrative Process to a Building Design and Construction project.
According to the LEED v4 BD+C Reference Guide, the OPR is a document that details the ideas, concepts, and criteria that are determined by the owner to be important to the success of the project 1. The OPR must include, among other things, the following information related to energy efficiency 1:
The owner's energy performance goals and expectations
The owner's requirements for energy metering and monitoring
The owner's requirements for energy modeling and analysis
The owner's requirements for commissioning and verification
The owner's requirements for training and documentation
The other options are not required to be present in the OPR, as they are either related to other aspects of the project, such as codes and standards, interior finishes, or project team members, or they are not relevant to the Integrative Process, which focuses on early analysis of energy, water, and site systems 2.References: LEED v4 BD+C Reference Guide, Integrative Process Category, IPc Integrative Process, page 632.


NEW QUESTION # 53
A design team is working on a new building project and is employing an integrated, whole-building approach.
Thearchitects want to increase the size of a glazed opening on the south facing wall. Which team members are first affected by this change?

  • A. Facility managers
  • B. Landscape architects
  • C. Civil engineers
  • D. Mechanical engineers

Answer: D

Explanation:
Explanation
According to the LEED v4: Building Design and Construction Guide, an integrated, whole-building approach is a process that requires collaboration and communication among all project team members and stakeholders throughout all phases of a project, from pre-design to occupancy and operations.The goal of this approach is to optimize the environmental and human health performance of a building as a whole, rather than focusing on individual components or systems1.
One of the benefits of an integrated, whole-building approach is that it allows the project team to identify and evaluate the interrelationships and trade-offs among various design strategies and decisions, and to optimize the synergies and minimize the conflicts among them1.For example, increasing the size of a glazed opening on the south facing wall may have implications for the daylighting, solar heat gain, thermal comfort, energy use, and mechanical system design of the building2.Therefore, the team members who are first affected by this change are the mechanical engineers, who are responsible for designing the heating, ventilation, and air conditioning (HVAC) system of the building, and ensuring that it meets the thermal comfort and energy performance requirements of the project3.The mechanical engineers may need to adjust the size, type, and location of the HVAC equipment, ductwork, and controls, as well as perform energy modeling and analysis to evaluate the impact of the change on the building's energy consumption and emissions3.The mechanical engineers may also need to coordinate with the architects, lighting designers, and other team members to ensure that the change does not compromise the other design goals and criteria of the project3.
References: LEED v4: Building Design + Construction Guide, Integrative Process, Introduction1; LEED v4:
Building Design + Construction Guide, Energy and Atmosphere Credit, Optimize Energy Performance, Requirements2; LEED v4: Building Design + Construction Guide, Indoor Environmental Quality Credit, Thermal Comfort, Requirements3


NEW QUESTION # 54
What is the basis of energy consumption in determining the percentage of green power or carbon offsets?

  • A. Quality
  • B. Quantity
  • C. Efficiency
  • D. Performance

Answer: B

Explanation:
Explanation
The basis of energy consumption in determining the percentage of green power or carbon offsets is the quantity of energy used by the project, measured in kilowatt-hours (kWh) or British thermal units (Btu). Green power is electricity generated from renewable sources, such as solar, wind, hydro, biomass, or geothermal.
Carbon offsets are reductions or removals of greenhouse gas emissions from a project or activity that compensates for theemissions from another source. According to the LEED Reference Guide for Building Design and Construction1, the Energy and Atmosphere Credit, Green Power and Carbon Offsets, requires the project to engage in a contract for qualified resources that meet the following requirements:
* The contract term is at least five years.
* The green power or carbon offsets are based on the quantity of energy consumed by the building.
* The green power is Green-e Energy certified or the equivalent.
* The carbon offsets are Green-e Climate certified, Verified Carbon Standard certified, Gold Standard certified, or the equivalent.
References:
* LEED Reference Guide for Building Design and Construction v4
* Green Power and Carbon Offsets | U.S. Green Building Council
* Green Power and Carbon Offsets - LEEDuser
* Green Power and Carbon Offsets - LEED v4 for BD+C: New Construction ...


NEW QUESTION # 55
The contractor has submitted waste hauling reports for review in order to achieve Materials and Resources Credit, Construction and Demolition Waste Management. Which of the following materials on the documentation contribute towards the credit?

  • A. Excavated soil
  • B. Alternate Daily Cover
  • C. Wood derived fuel
  • D. Items sent to the local incinerator

Answer: C

Explanation:
Explanation
This option requires the project to classify wood derived fuel as a recycled material that contributes towards the credit, because it is a waste material that is converted into a useful energy source1. Wood derived fuel can be used for heating, electricity generation, or co-firing with other fuels2. According to the LEED v4: Building Design + Construction Guide, recycled materials are those that have been reprocessed or remanufactured from recovered materials3.
References: = LEED v4: Building Design + Construction Guide, Wood Derived Fuels - an overview | ScienceDirect Topics, Wood-Derived Fuels | Energy and the Environment | US EPA.


NEW QUESTION # 56
An existing vacant office building will be completely renovated and new mechanical, electrical and plumbingsystems will be installed. 20% of the building's gross floor area will be complete at the time of certification. Therewill be a data center and some retail stores on the ground floor of the building at a future date. Which rating systemis applicable for the building?

  • A. LEED BD+C: Retail
  • B. LEED BD+C: New Construction & Major Renovation
  • C. LEED BD+C: Core & Shell Development
  • D. LEED BD+C: Data Centers

Answer: C

Explanation:
Explanation
This rating system is suitable for projects where the developer controls the design and construction of the entire core and shell base building, but has no control over the design and construction of the tenant fit-out.
Since the building will have a data center and retail stores in the future, but these are not the primary function of the entire building, LEED BD+C: Core & Shell is more appropriate than LEED BD+C: Data Centers or LEED BD+C: Retail.
References: = LEED rating system selection guidance, LEED v4: Building Design + Construction Guide


NEW QUESTION # 57
The current facilities requirements (CFR) and operations and maintenance plan (OMP) required for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification must include

  • A. minimum outside air requirements
  • B. functional performance tests
  • C. installation verification (construction) checklists
  • D. issue logs

Answer: A

Explanation:
Explanation
The current facilities requirements (CFR) and operations and maintenance plan (OMP) are two documents that are required for the Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification. The CFR is a document that describes the owner's project requirements, such as the design intent, performance goals, and operational needs of the building. The OMP is a document that provides information and guidance on how to operate and maintain the commissioned systems and equipment. According to the LEED v4 Reference Guide for Building Design and Construction, the CFR and OMP must include the minimum outside air requirements, which are the minimum rates of outdoor air ventilation that are needed to provide acceptable indoor air quality and thermal comfort for the occupants1. The issue logs, functional performance tests, and installation verification (construction) checklists are not required to be included in the CFR and OMP, but they are part of the commissioning process and documentation.
References:
*LEED v4 Reference Guide for Building Design and Construction, Energy and Atmosphere Prerequisite:
Fundamental Commissioning and Verification, page 2611
*Fundamental commissioning and verification | U.S. Green Building Council2


NEW QUESTION # 58
Which of the following products are eligible for a WaterSense label?

  • A. Tankless toilets
  • B. Private lavatory faucets
  • C. Waterless urinals
  • D. Public lavatory faucets

Answer: B

Explanation:
Explanation
Private lavatory faucets are eligible for a WaterSense label, provided they meet EPA's specifications for water efficiency and performance, and are backed by independent, third-party certification. Tankless toilets, waterless urinals, and public lavatory faucets are not eligible for a WaterSense label because they are not included in the product categories that WaterSense covers. WaterSense currently labels products in the following categories: tank-type toilets, water-using urinals, private lavatory faucets, showerheads, irrigation controllers, spray sprinkler bodies, and pre-rinse spray valves.References:
* WaterSense Products | US EPA1
* The WaterSense Label | US EPA2
* Water Sense Labeling | LEEDuser3
* Labeled Faucet Questions | WaterSense | US EPA4
* What is the WaterSense Label and How Does it Apply?5


NEW QUESTION # 59
When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following must be included in the Basis of Design (BOD)?

  • A. Facility, system and assembly performance assumptions
  • B. Training requirements
  • C. Environmental, energy efficiency and sustainability goals
  • D. Allowable tolerance for facility operations

Answer: C

Explanation:
Explanation
The Basis of Design (BOD) is a document that describes the design intent and performance criteria for a project. It must include the environmental, energy efficiency and sustainability goals that theproject team has established, as well as the strategies and systems to achieve them. The BOD is part of the Integrative Process credit, which aims to foster collaboration and holistic thinking among the project stakeholders from the pre-design phase to the occupancy phase.
References: = [LEED v4: Building Design + Construction Guide], [Integrative Process Calculator],
[Integrative Process credit].


NEW QUESTION # 60
A project team compares a life-cycle assessment (LCA) model to a baseline design to determine the reductions in six impact categories. One impact category exceeds the baseline by 7%. Whichalternative analyses should the team run to check different impact measurements?

  • A. Decrease the gross floor area of the baseline building
  • B. Change the orientation of the design case building
  • C. Optimize the slab depth of the design case building
  • D. Increase the wall mass and types of windows in the baseline building

Answer: C

Explanation:
Explanation
This alternative analysis can help the team check the impact of reducing the amount of concrete used in the building, which can affect several impact categories, such as global warming potential (GWP), acidification, and eutrophication1. Concrete is a material with high embodied energy and carbon emissions, and reducing its use can lower the environmental impact of the building2. Optimizing the slab depth can also improve the thermal performance and daylighting of the building, which can reduce the operational energy use and demand3.
References: = LCA in LEED - Whole-building Life Cycle Assessment, Concrete and Embodied Carbon - Can we reduce carbon emissions and still use concrete?, Optimizing Slab Thickness for Energy Performance.


NEW QUESTION # 61
In the calculations for Water Efficiency Credit, Outdoor Water Use Reduction, food gardens

  • A. must be calculated using 100% potable water
  • B. must be calculated using at least 20% from an alternative water source
  • C. may be included or excluded from the calculations
  • D. may be calculated using a standard 20% reduction from baseline

Answer: C

Explanation:
Explanation
Food gardens may be included or excluded from the calculations for Water Efficiency Credit, Outdoor Water Use Reduction, as per the project team's discretion. If included, food gardens must be calculated using 100% potable water. If excluded, food gardens must be irrigated with 100% captured rainwater, recycled graywater, or water treated and conveyed by a public agency specifically for nonpotable uses.References:
* Outdoor Water Use Reduction credit in LEED BD+C: New Construction v4.1 - LEED v4.11
* LEED v4 BD+C WE Guide2


NEW QUESTION # 62
......