Authentic Best resources for MB-320 Test Engine Practice Exam [Q54-Q78]

Share

Authentic Best resources for MB-320 Test Engine Practice Exam

[2021] MB-320 PDF Questions - Perfect Prospect To Go With ValidDumps Practice Exam

NEW QUESTION 54
A customer produces light projection toys for holiday decorations throughout the year. Vendors have negotiated rebate agreements as a condition of their contact. The contract also contains the visual templates required for the customer to use in a season.
Vendor rebate agreements must only be applied if the following requirements are met:
* Units of measure for deliverables are the same unit of measure as on the agreement
* The agreement is valid as of the date a purchase order is generated
You need to configure the vendor rebate agreements.
What should you do?

  • A. Set the Cumulative purchase by field value to the beginning of the season date
  • B. Set the Rebate line break type field value to Amount
  • C. Set the Unit of measure rebate option field value to Exact match
  • D. Set the Rebate line break type field value to Quantity

Answer: C

Explanation:
Section: Create, process, and manage production batch orders
Explanation/Reference:
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/procurement/vendor-rebates

 

NEW QUESTION 55
You are the production planner for a manufacturing company.
After running operations scheduling for a production order, the following error message displays:

You need to identify the cause of the error.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Review the available resources for Operation 10. Navigate to the Resource form and validate whether there is a calendar assigned
  • B. Review the calendar for the resource to determine if it is expired.
  • C. Review the resource group assigned to Operation 10. Check to see if there is a calendar assigned and if the calendar is expired.
  • D. Navigate to the work calendar and view working times. Validate that there are working days created in the scheduled period.

Answer: A,B

 

NEW QUESTION 56
You are the quality assurance manager of a pharmaceuticals company.
One of your customers has requested to only receive batches of item B0001 that have an acid concentration between 5.5% -10.5%.
You need to set up the customer specific batch attribute to track percent acid for B0001.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 57
A company uses manufacturing execution for processing of production orders.
Multiple production orders from last week need to be ended.
You need to process the time registrations to allow the orders to end.
Which four steps should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

 

NEW QUESTION 58
A company produces homeopathic lotions for pain relief and uses Dynamics 365 for Finance and Operations.
Several components used in the production of the pain-relieving lotion and oils have special government-mandated reporting requirements.
You need to ensure the company can provide the appropriate reporting and tracking for these components.
Which parameters should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

 

NEW QUESTION 59
You are the product definition manager for a car manufacturing company. You set up and maintain the production configuration models used at the company.
You must build a new configuration model and include constraints in the model.
You need to determine which constraint type to use for each scenario.
Which constraint type should you use? To answer, drag the appropriate constraint types to the correct scenarios. Each constraint type may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/build-product-configuration-model

 

NEW QUESTION 60
You are the production scheduler for a manufacturing company. You have run the Resource Group Capacity report as shown in the Resource Group 21 Capacity exhibit. (Click the Resource Group 21 Capacity tab).

After reviewing that report, you run Resource Capacity reports as shown in the Resource 2101 and 2102 Capacity exhibits. (Click the 2101 Capacity and 2102 Capacity tabs.)

You run the Gantt chart report as shown in the Gantt exhibit to determine the production orders scheduled on the resources. (Click the Gantt tab.)

You need to determine the method to schedule the production lines.
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 61
A company uses Dynamics 365 for Finance and Operations for Process manufacturing.
Employees spend considerable time cleaning and setting up machines in a specific area between production orders. You must group production activities to optimize cleaning and set up time.
You need to set up the system.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: More than one order of answer choices is correct. You will receive credit for any of the correct orders you select.

Answer:

Explanation:

1 - Create sequence IDs specifying values and ranking.
2 - Assign sequence IDs to items.
3 - Assign sequence group IDs to resources and resource groups.
4 - Create sequence groups.

 

NEW QUESTION 62
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 for Finance and Operations for their Lean manufacturing environment.
There has been an engineering change to a fixed quantity product that is in production. This change will add an additional processing step as the second step. The existing version must be phased out and replaced by the new version.
You need to ensure that the engineering change takes affect at the end of the month.
Solution:
* Add a new version to the existing production flow. Set the expiration date to the end of the month.
* Create an activity for the new process step and add it in the proper sequence.
* Create a Kanban rule that incorporates the new activity. Set the expiration date to the end of the month.
* Edit the existing Kanban rule. Set the expiration date to the end of the month. Specify the new Kanban rule as the replacement rule.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

 

NEW QUESTION 63
You are building the Bill of materials (BOM) for a new production item. The new item has a subcomponent.
Subproduction orders for the subcomponent must be created when estimating production orders.
You need to configure the BOM line to generate subproduction orders.
Which BOM line type should you use?

  • A. Item
  • B. Vendor
  • C. Pegged supply
  • D. Phantom

Answer: C

Explanation:
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/bill-of-material-bom

 

NEW QUESTION 64
A company produces custom-made bicycles that offer many different configurations.
Your standard bicycle, B-0001, is made with many common components such as a frame and wheels.
Customers can choose between two frames: F-0001 or F-0009. Wheel W-0001 is only compatible with frame F-0001.
You create the following configuration groups: Frames, Wheels
You need to ensure that users can only select valid combinations of frames and wheels.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/dimension-based-product-configuration

 

NEW QUESTION 65
A company plans to implement Dynamics 365 for Finance chain Operations.
You need to determine which manufacturing solutions to use.
Which manufacturing solution should you use? To answer, drag the appropriate setting to the correct drop targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 66
A Discrete manufacturing company produces speakers. The high-end speaker model uses protective rubber strips on the edges.
Approximately five inches of rubber is consistently scrapped in the production process, regardless of production quantity. Workers manually consume the extra material on the picking list or scrap it in an inventory journal.
You need configure the system to automatically account for this scrap on the Bill of materials (BOM).
What should you do?

  • A. Set a Constant scrap of five on the BOM line for rubber
  • B. Set a variable scrap of five percent for the rubber BOM line
  • C. Increase the required quantity of the rubber component by five on the BOM
  • D. Add an additional BOM line for five inches and set consumption to Variable

Answer: A

Explanation:
Explanation/Reference:
References:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/about-information-used-in-bom-calculations- with-standard-costs

 

NEW QUESTION 67
Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company produces and distributes seafood to supermarkets. During the manufacturing process, raw seafood is purchased, cleaned, and packaged into various-sized boxes. Each box may have a different weight.
Product is sold by the box and priced by the pound.
You need to ensure that you can perform transactions at the box level and record the net weight of goods shipped to a customer.
Solution: Set up the product with a sales unit measure of pounds and inventory unit measure of box. Set a standard unit conversation for the product from box to pounds.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/about-catch-weight-items

 

NEW QUESTION 68
You work for a gem wholesaler that sells raw diamonds. Diamonds are purchased and sold in individual boxes but weighed and inventoried in carats.
You are setting up a catch weight item for diamonds. Each box of diamonds must be tracked by its individual container weight.
You need to set up this item as a full visibility catch weight item.
Which two steps must you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Assign the item a Tracking dimension group with active serial number control.
  • B. Create an inter-class unit of measure conversion between boxes and carats.
  • C. Assign a Tracking dimension group with batch number as the only active tracking dimension.
  • D. Assign it a Serial number group with

Answer: A,B

Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/create-a-catch-weight-item-with-full-visibility

 

NEW QUESTION 69
A company overstates on-hand raw materials due to the time it takes to post raw materials as consumed when production orders are processed.
All items used to manufacture finished goods must be consumed when a finished good is reported as finished.
You must not change all bill of materials lines to use the option of flushing principal.
You need to ensure that all production orders consume raw materials at Report as finished.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 70
A company is looking to use Dynamics 365 Supply Chain Management.
The company is in the process of redesigning and retooling an existing manufacturing plant to group similar, cellular operations to improve efficiency and minimize wasted time between operations. They want to locate raw materials close to where they are needed without losing reorder visibility.
You need to set up their environment.
Which kind of production type should you implement?

  • A. Discrete manufacturing
  • B. Manufacturing execution
  • C. Process manufacturing
  • D. Lean manufacturing

Answer: D

 

NEW QUESTION 71
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some questions sets might have more than one correct solutions, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 for Finance and Operations for their Lean manufacturing environment.
There has been an engineering change to a fixed quantity product that is in production. This change will add an additional processing step as the second step. The existing version must be phased out and replaced by the new version.
You need to ensure that the engineering change takes affect at the end of the month.
Solution:
1.) Add a new version to the existing production flow. Set the expiration date to the end of the month.
2.) Create an activity for the new process step and add it in the proper sequence
3.) Create a Kanban rule that incorporates the new activity. Set the expiration date to the end of the month.
4.) Edit the existing Kanban rule. Set the expiration date to the end of the month. Specify the new Kanban rules as the replacement rule Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

Explanation:
Section: Create and manage production and lean orders

 

NEW QUESTION 72
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company uses Dynamics 365 Supply Chain Management to manage production configuration.
A product designer creates a remote control toy that can be purchased with different tire sizes.
Sales representatives need to perform product configuration for the custom tire variants when they create a new order.
Solution: Select the custom tire size when filling out each sales order line.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: B

 

NEW QUESTION 73
A customer produces light projection toys for holiday decorations throughout the year.
You must implement Bills of material (BOMs) for the product lifecycle. The solution must meet the following requirements:

You need to create a BOM for each phase.
Which BOM types should you use? To answer, select the appropriate configuration options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 74
You are the lead product design engineer at a plastics manufacturing company. You implement a new process that uses a single tool to produce three finished goods at the same time.
You need to set up the planning item number and formula to correctly to manufacture the three items.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Specify each of the finished good items as co-products
  • B. Create item number for planning item and the associated formula
  • C. Add a coverage group to the formula
  • D. Add minimum and maximum quantities on formula
  • E. Assign co-products to the formula

Answer: A,B,E

Explanation:
Section: Create, process, and manage production batch orders

 

NEW QUESTION 75
A glass bottle manufacturer uses route operations to schedule resources and track manufacturing costs.
The company has recently seen an increase in demand and purchases another resource. The company uses the same costs per resource. However, the new resource costs more to run. The company must be able to track cost contributions for the new resource.
You need to create a cost category for the new resource.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 76
A glass bottle manufacturer uses route operations to schedule resources and track manufacturing costs.
The company has recently seen an increase in demand and purchases another resource. The company uses the same costs per resource. However, the new resource costs more to run. The company must be able to track cost contributions for the new resource.
You need to create a cost category for the new resource.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

 

NEW QUESTION 77
A company uses Process manufacturing.
You need to review formulas and how the different ingredient types impact the batch balancing process.
Which ingredient types should you use? To answer, drag the appropriate ingredient types to the correct scenarios. Each ingredient may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/batch-balancing

 

NEW QUESTION 78
......

Best updated resource for MB-320 Online Practice Exam: https://www.validdumps.top/MB-320-exam-torrent.html

Realistic Practice MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Exam Braindumps: https://drive.google.com/open?id=1rwfSpwIkjWw9GwfprJgW7NwdXXin1DuS